After 10 hour connect train to Sylhet Reviewed by Momizat on . Three fire engines Habiganj, Sylhet, 10 hours after being derailed rail links with the country, has started. Abu Sayeed Noapara station master, train and resume Three fire engines Habiganj, Sylhet, 10 hours after being derailed rail links with the country, has started. Abu Sayeed Noapara station master, train and resume Rating: 0
You Are Here: Home » Bangladesh » After 10 hour connect train to Sylhet

After 10 hour connect train to Sylhet

6870-1238321727

Three fire engines Habiganj, Sylhet, 10 hours after being derailed rail links with the country, has started.
Abu Sayeed Noapara station master, train and resumed at 8 pm on Friday night.

Earlier, at 10 am Noapara station ‘pigeon Express was derailed three fire engines. The Sylhet rail stops across the country.

At least 30 people were injured in the rush to get off the train, witnesses said.

Leave a Comment

© 2016 Powered By my24bd.com Theme By Neef IT

Scroll to top
shared on wplocker.com